Welcome to Tai'an Dingkun New Material Co. Ltd!
English
Home > News > Technical Requirements For The Construction of Plastic Drainage Panels

Technical Requirements For The Construction of Plastic Drainage Panels

What are the technical requirements for the construction of plastic drainage panels?

Let's take a look at the contents and some technical requirements. It should be paid attention to during the implementation of plastic drainage panels.

1. The first is to measure the relevant foundation data, which is conducive to better control the number of drainage panels in the future.

2. Plastic drainage panels are inserted from both sides of the foundation to the center.

3. Insert the hollow casing, together with steel boots and plastic drainage panels, into the ground with a plug-in machine to reach the predetermined elevation.

4. At the same time, after arriving at the position, the data of the fixed position are measured.

5. In order to prevent the waste of plastic drainage boards, the laying depth of each drainage board is first calculated according to different regions and reinforcement depth. And then the laying depth and length of each plastic drainage board are determined.